BCM Glass · Free tools
Field Guide Tools
Free workbooks and fillable forms for buying out, scheduling, and installing commercial glazing. No sign-up.
Each tool is explained step by step in the manual chapter listed on its card. Use them on any project, with any glazing contractor.

Excel workbook · For general contractors
Glazing Bid Leveling Workbook
Level up to four glazing bids across 28 scope lines. Calculates leveled bids, variance from the lowest leveled bid, rank, open items, and allowances. How to use it

Excel workbook · For general contractors
Division 08 Scope Responsibility Matrix
Assign every glazing interface item to a trade, with Furnish, Install, and Connect or Test columns and an automatic count of anything still unassigned. How to use it

Fillable PDF · For general contractors
Guaranteed Opening Dimensions Form
Record the dimension basis, agreed tolerances, and signatures so frames can be built and glass ordered without waiting on field verification. How to use it

Fillable PDF · For general contractors
Site Readiness Checklist
Walk the area with the glazing foreman before mobilizing and confirm 17 readiness items in writing, with open items and sign-off. How to use it

Fillable PDF · For general contractors
Pre-Install Meeting Agenda and Minutes
A ten-item agenda for the glazing scope that doubles as the meeting minutes, with an attendee list and action item log. How to use it
Basis and limits General guidance only. The contract documents, project specifications, and your own procedures govern each project. Forms supplement and do not replace your subcontracts. Questions: estimating@bcmglassco.com.